Remodels built right, on a schedule you can plan around

Kitchens, bathrooms, basements and additions across the Salt Lake Valley, with one project lead from walkthrough to final punch list.

Remodeling Wasatch Front homes since 2009

A small team that takes on a limited number of projects at a time, so every job gets a lead who’s on site, not just on the phone.

Licensed
Utah general contractor (B100)
Insured
$2M liability + workers’ comp
Warranty
Two years, in writing
Financing
Through a partner lender

Certificates of insurance and our license details come with every proposal. Members of NARI Utah. We reply to every inquiry within one business day.

What we build

All five services

How a Talus Ridge project runs

Homeowner shaking hands and receiving keys from a builder

Walkthrough

We meet at your home, measure, and talk through goals, must-haves and budget. About an hour.

Finished shaker-style kitchen with white cabinets and hexagon tile

Design & selections

Plans, 3D layouts and one selections day for cabinets, tile, fixtures and finishes.

Carpenter measuring a board at a job-site workbench

Fixed-price proposal

An itemized proposal with payments tied to milestones like rough-in and drywall, not calendar dates.

Interior mid-renovation with ladders, new framing and protected doorways

Build

One project lead on site, a shared schedule, and a written update with photos every Friday.

Installer in work gloves fastening new wood flooring

Punch list & warranty

We walk the finished space together, close every item, then hand over a two-year workmanship warranty.

How long will it take?

Pick a project and drag through a typical Talus Ridge schedule to see what happens each week.

  1. Design & selectionsWeeks 1–3: Layout, 3D renderings and one selections day for cabinets, counters and tile.
  2. Permits & orderingWeeks 3–5: We pull permits and order cabinets and appliances so nothing holds the build up later.
  3. DemolitionWeeks 5–6: Dust walls up, floors protected, old kitchen out in two or three days.
  4. Rough-in & inspectionsWeeks 6–8: Plumbing, electrical and any wall or beam work, then city inspections.
  5. Cabinets & countersWeeks 8–10: Cabinets set, counters templated and installed, backsplash tiled.
  6. Finishes & punch listWeeks 10–12: Lighting, appliances, paint and trim, then a walk-through together.

Design & selections. Layout, 3D renderings and one selections day for cabinets, counters and tile.

  1. Design & selectionsWeeks 1–2: Layout, tile, vanity and fixtures chosen in one meeting.
  2. DemolitionWeeks 2–3: Down to the studs so we can see and fix what’s behind the walls.
  3. Plumbing & waterproofingWeeks 3–4: New supply and drain lines, then a fully waterproofed shower system.
  4. TileWeeks 4–6: Floors, walls and niches set by our own tile crew.
  5. Fixtures & punch listWeeks 6–7: Vanity, glass, fixtures and lighting, then final walk-through.

Design & selections. Layout, tile, vanity and fixtures chosen in one meeting.

  1. Design & permitsWeeks 1–4: Floor plan, egress windows and drawings for the permit.
  2. Egress & framingWeeks 4–6: Egress windows cut in, walls framed, soffits built.
  3. Rough-in & inspectionsWeeks 6–8: Electrical, plumbing and HVAC runs, then framing and rough inspections.
  4. Insulation & drywallWeeks 8–11: Foundation walls insulated, rim joist sealed, drywall hung and finished.
  5. Finishes & punch listWeeks 11–14: Flooring, doors, trim, paint and the bathroom, then final inspection.

Design & permits. Floor plan, egress windows and drawings for the permit.

Client review

“They opened up our main floor, and the schedule they gave us on day one was the schedule they hit. The Friday updates made it easy to plan around, and the final price matched the proposal to the dollar.”

Rachel & Tom B.
Holladay · Kitchen and main-floor remodel

“Our basement went from storage to the room everyone hangs out in. Clean job site every single night.”

Marcus L. · Sandy · Basement finish

“The most detailed proposal we got by far, and they’ve already started on our primary bath.”

Helen W. · Millcreek · Bathroom remodel

Before you call

Budgets and timelines for every project type are on the services page. Or call (555) 555-0187.

How much does a kitchen remodel cost in Salt Lake City?

Most of our full kitchen remodels land between $45,000 and $95,000, depending on layout changes, cabinets and appliances. You’ll get an itemized number after the walkthrough.

Do you pull the permits?

Yes. We handle permits, inspections and engineering when they’re needed, and the cost is included in your proposal.

Can we live at home during the remodel?

Usually, yes. We set up dust walls and floor protection and keep one path through the house clear. For kitchens we help you set up a temporary kitchen.

How far out are you booking?

Design typically starts within two to three weeks of the walkthrough, and construction six to ten weeks after that, once selections and permits are in place.

Start with a walkthrough

We’ll come out, measure, listen to what you want, and follow up with a clear proposal and a realistic schedule.